Skip to content
Manufacturing

Cut, machined, welded and painted under one roof.

Milling, turning, plasma and gas cutting, bending, rolling, welding, assembly, painting and quality assurance happen in our own factory.

Production floor: 3,000 m². 50,000+ attachments delivered.

The work in our own factory

Nine processes in our own factory, shown below in seven steps. A partner blasts the steel before we paint it.

From raw steel to dispatch01Material intakeEN 10204 3.102Plasma cuttingEckert CNC03Milling and turningStarrag Heckert · Mazak04WeldingEN ISO 3834-2 · MAG 135 · TIG 14105Assembly and fit-upErmaksan · Amada · MG06Painting07InspectionEN ISO 9712
The seven steps, with the machines and standards each step uses.
Material intake

01

Material intake

Plate and sections arrive with EN 10204 3.1 inspection certificates, issued per heat and filed against the order.

Plasma cutting

02

Plasma cutting

Profiles are cut in house to repeatable tolerances, so the parts fit up before welding.

Cut on an Eckert CNC plasma and gas cutting table with 3D bevel cutting.

Milling and turning

03

Milling and turning

Bushings, pin bores and coupler interfaces are machined here, so the pin centres match the drawing.

Milled on a Starrag Heckert 4-axis CNC horizontal machining centre and turned on a Mazak 4-axis CNC turning centre.

Welding

04

Welding

MAG 135 and TIG 141, to procedures qualified by WPQR, by welders qualified to EN ISO 9606-1.

Assembly and fit-up

05

Assembly and fit-up

Subassemblies are dry-fitted and measured before final welding locks the geometry in.

Plate is bent on Ermaksan and Amada CNC press brakes and rolled on an MG four-roll plate rolling machine. Overhead cranes move the parts.

Painting

06

Painting

A partner blasts the steel. We paint it in our own factory.

Painted in two electrostatic painting and drying cabins.

Inspection

07

Inspection

Visual and penetrant testing by personnel certified to EN ISO 9712, on the joints the drawing calls for, with dimensional checks on the mounting interface.

From plate to pallet

Photographs from our own workshop.

  • Welded coupler frames with their pins fitted, stacked on a pallet.

    Welded coupler frames with their pins fitted, stacked on a pallet.

  • Painted couplers strapped to a pallet, with plate stock behind.

    Painted couplers strapped to a pallet, with plate stock behind.

  • A bucket shell with its internal ribs, before painting.

    A bucket shell with its internal ribs, before painting.

  • A painted two-tine attachment strapped to its pallet.

    A painted two-tine attachment strapped to its pallet.

  • Unpainted ripper bodies standing upright on pallets.

    Unpainted ripper bodies standing upright on pallets.

  • Welded grab halves stacked on a pallet.

    Welded grab halves stacked on a pallet.

  • Fitting a pin into a machined coupler body.

    Fitting a pin into a machined coupler body.

  • A cylinder and its hoses being fitted inside a weldment.

    A cylinder and its hoses being fitted inside a weldment.

  • A coupler assembly on the drilled welding table.

    A coupler assembly on the drilled welding table.

  • Assembly work at the bench, with the parts bins behind.

    Assembly work at the bench, with the parts bins behind.

  • Hand-fitting the last parts on the welding table.

    Hand-fitting the last parts on the welding table.

  • A painted assembly with its hydraulics fitted.

    A painted assembly with its hydraulics fitted.

  • A finished coupler on the shop floor.

    A finished coupler on the shop floor.

  • Identical coupler frames stacked from a production run.

    Identical coupler frames stacked from a production run.

  • A bucket with bolt-on teeth and side cutters.

    A bucket with bolt-on teeth and side cutters.

  • Fresh paint on a bucket edge.

    Fresh paint on a bucket edge.

  • The welded mounting lugs on the back of a painted bucket.

    The welded mounting lugs on the back of a painted bucket.

  • Finished buckets on pallets, loaded in the trailer.

    Finished buckets on pallets, loaded in the trailer.

  • A forklift carrying a palletised bucket out of the factory.

    A forklift carrying a palletised bucket out of the factory.

  • Moving a toothed bucket on its pallet through the hall.

    Moving a toothed bucket on its pallet through the hall.

  • A coupler strapped to its pallet, ready to ship.

    A coupler strapped to its pallet, ready to ship.

Welding Hardox® plate

Hardox® is quenched-and-tempered plate. Poorly controlled heat input, preheat and interpass temperature increase the risk of excessive softening in the heat-affected zone and of hydrogen-assisted cold cracking at the joint that carries the load.

The EN ISO 3834-2 certificate covers comprehensive welding quality requirements. The EN 1090-1 certificate covers factory production control for structural steel components in execution classes EXC1 and EXC2.

Qualified processes: MAG 135 · TIG 141

What is certified, and by whom

Certified welding quality

EN ISO 3834-2

EN ISO 3834-2 is the comprehensive level of quality requirements for fusion welding. It covers how welding is planned, carried out, inspected and recorded.

Covers
Fusion welding at our factory under EN ISO 3834-2: how welds are planned, made, inspected and recorded.
Does not cover
It certifies how we weld. It is not a product certificate and does not rate an attachment for a particular machine.

Certificate: CSW/1293/2025 · UDT-CERT

Factory production control

EN 1090-1 EXC1 + EXC2

Factory production control for structural steel components under EN 1090-1, execution classes EXC1 and EXC2, certified by notified body 1433.

Covers
Factory production control for structural steel components in execution classes EXC1 and EXC2.
Does not cover
Execution classes EXC3 and EXC4 are not covered.

Certificate: 1433-CPR-0257 · UDT-CERT: notified body 1433

Qualified welders and procedures

EN ISO 9606-1 · WPQR EN ISO 15614

Welders qualified to EN ISO 9606-1, and welding procedures qualified by WPQR to EN ISO 15614. The qualified processes are MAG 135 and TIG 141.

Covers
Our welders and welding procedures for the processes MAG 135 and TIG 141.
Does not cover
Other welding processes are not qualified.

Non-destructive testing

EN ISO 9712: VT + PT level 2

Visual and penetrant testing by personnel certified to EN ISO 9712 at level 2. Applied to the joints the drawing calls for, not to every weld.

Covers
Visual (VT) and penetrant (PT) testing by personnel certified to EN ISO 9712 at level 2.
Does not cover
Ultrasonic and radiographic testing are not included. Only the joints the drawing or inspection plan names are tested.

Material traceability

EN 10204 3.1

EN 10204 3.1 inspection certificates, issued per heat of steel and kept with the order.

Covers
The steel itself: one EN 10204 3.1 inspection certificate per heat, linked to the order and serial number.
Does not cover
It documents the material, not the welds or the finished attachment.

CE marking

CE: 2006/42/EC

Declaration of Conformity under the Machinery Directive 2006/42/EC for every quick coupler and hydraulic attachment we make. Signed by Hydro-Instal as the manufacturer.

Covers
Quick couplers and hydraulic attachments: the CE mark and an EU declaration of conformity under Machinery Directive 2006/42/EC.
Does not cover
Buckets and other attachments without hydraulics are not part of this statement.

Transition to Regulation (EU) 2023/1230 underway. Applicable from 20 January 2027.

What we make

Our product lines

  • Buckets
  • Quick couplers
  • Tools
  • Grapples

Catalogue attachments for excavators up to 65 t.

Larger attachments, up to 8 t for excavators up to 80 t, are custom engineered to order.

How we check it

  • Welding under our EN ISO 3834-2 certified quality system.
  • A record for every serial number, so the spare parts match your attachment.
  • Engineered-to-order builds pass a factory acceptance test before dispatch: dimensions, welds and fit.

Every offer names the dispatch week.

Need a price for your machine?

Tell us the machine and the attachment you need. We usually reply within 1 working day.